1. Spray warning signs on the surface of the equipment shell or box, such as prohibiting fireworks, preventing bumps and equipment numbers, or hanging warning signs;
2. Check and measure whether the static-conducting device meets the parameter requirements, and whether the instruments at all levels operate normally;
3. During the debugging process, it is strictly forbidden to smoke, prevent static electricity, and prevent bumping and knocking on pipes and equipment;
4. The valve should be opened slowly, and should not be opened and closed suddenly;
5. Regular inspection and maintenance of the emergency shut-off valve. Test, inspect and maintain the shut-off valve no less than once a week.