1. Spray warning signs on the surface of the equipment shell or box, such as no fireworks, no bumping and equipment numbers, or hang warning signs.
2. Check and measure whether the static conductive device meets the parameter requirements, and whether the instruments are operating normally.
3. During the debugging process, fireworks are strictly prohibited to avoid static electricity, and it is forbidden to bump and knock on pipes and equipment;
4. The valve should be opened slowly, not violently opened and closed.
5. Regular inspection and maintenance of the emergency shut-off valve, test, check and maintain the shut-off valve at least once a week.
During the rising process, the fin wall above the liquid surface is constantly wetted, and the gas absorbs a part of the liquid droplets with the same temperature as the rising airflow and flows downward along the inner wall. After the liquid surface is mixed with the liquid at a slightly lower temperature, the liquid surface is increased. In terms of the application of these two technologies, the temperature of the inner wall of the finned tube is made uniform, and the heat density and the heat transfer rate of the finned tube are further increased. The thermal coefficient improves the heat transfer performance of the air-temperature vaporizer and ensures the gasification of liquefied LPG and LNG.
https://www.chinavaporizer.com/





